| Measure | Realization |
| Indicator Name: | Time required to deal with construction permits (days) |
| Indicator Source: | World Bank, Doing Business project (http://www.doingbusiness.org/). | macro-rankings.com |
| Indicator Description: | The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice. |
| Observations Date: | 12/31/2012 |