Dealing with construction permits: Time (days) for Honduras



Indicator Definition:
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.

The indicator "Dealing with construction permits: Time (days)" stands at 132.00 as of 12/31/2019.
Regarding the One-Year-Change of the series, the current value is equal to the value the year prior.
The 1 year change in percent is 0.0.
The 3 year change in percent is 11.86.
The 5 year change in percent is 12.82.
The 10 year change in percent is 17.86.

The Serie's long term average value is 132.67. It's latest available value, on 12/31/2019, is 0.503 percent lower, compared to it's long term average value.
The Serie's change in percent from it's minimum value, on 12/31/2009, to it's latest available value, on 12/31/2019, is +17.86%.
The Serie's change in percent from it's maximum value, on 12/31/2005, to it's latest available value, on 12/31/2019, is -30.53%.